{"id":966,"date":"2026-11-13T09:00:20","date_gmt":"2026-11-13T09:00:20","guid":{"rendered":"https:\/\/www.newerahomes.com\/blog\/?p=966"},"modified":"2026-11-13T17:12:31","modified_gmt":"2026-11-13T17:12:31","slug":"building-a-home-around-the-school-year","status":"publish","type":"post","link":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/","title":{"rendered":"Can You Move Into a New Build Before the School Year Starts?"},"content":{"rendered":"<p>Building a home while raising school-age children takes careful scheduling. If you want to move into a new home in Bend before classes begin, you&#8217;ll need to plan time for design decisions, permits, construction, inspections, and the move itself.<\/p>\n<p>Can you build a semi-custom home before the school year starts? Yes, if you begin early enough and the construction schedule supports your target date. But a builder can&#8217;t promise an August move-in without first evaluating your lot, design choices, and construction requirements.<\/p>\n<p>To plan a home build around the school year, work backward from your preferred move-in date. You&#8217;ll get a clearer picture of when planning needs to begin, which stages could cause delays, and whether moving before September is realistic.<\/p>\n<h2>When Does the School Year Start in Bend?<\/h2>\n<p>Using the<a href=\"https:\/\/www.blschools.org\/parent-resources\/calendar\"> <\/a><a href=\"https:\/\/www.blschools.org\/parent-resources\/calendar\">Bend-La Pine Schools 2026\u201327 calendar<\/a> for reference, we can see that classes begin in September, with different start dates by grade level.<\/p>\n<div style=\"overflow-x:auto;margin:26px 0;\">\n<table style=\"width:100%;min-width:640px;border-collapse:collapse;border-top:1px solid #e7dfd4;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Date<\/strong><\/th>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>School calendar milestone<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">September 9, 2026<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">First day for grades 1\u20136 and 9; staggered kindergarten start<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">September 10, 2026<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">First day for grades 7\u20138 and 10\u201312; staggered kindergarten start<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">September 11, 2026<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">All grade levels attending<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">June 17, 2027<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Last scheduled day of school<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">June 22\u201325, 2027<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Possible weather-related makeup days<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Families should confirm their children&#8217;s schedules with their individual schools, particularly for kindergarten and specialized programs.<\/p>\n<h3>Why Moving Before September Gives Families More Time<\/h3>\n<p>For a smooth transition into your new home, you\u2019ll want plenty of time between getting the keys and being ready for the first day of school. <\/p>\n<p>Moving involves unpacking bedrooms, setting up utilities, arranging transportation, transferring school records, and learning your way around a new neighborhood. For families relocating from another city or state, children also need time to adjust to their new surroundings.<\/p>\n<p>For example, a family hoping to be settled before September 9, 2026, might choose August 15 as the preferred move-in date. That would leave several weeks to unpack and prepare for school.<\/p>\n<h2>How to Plan Home Construction Around the School Year<\/h2>\n<p>To plan construction around the school year, familiarize yourself with the full building sequence.<\/p>\n<p>It&#8217;s tempting to focus on how long construction takes after work begins, but planning, permits, and site preparation have to happen before the main building process. Finishing construction doesn&#8217;t necessarily mean your family can move in immediately, either.<\/p>\n<p>The following table shows how to work backward from your preferred move-in date.<\/p>\n<div style=\"overflow-x:auto;margin:26px 0;\">\n<table style=\"width:100%;min-width:640px;border-collapse:collapse;border-top:1px solid #e7dfd4;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Project stage<\/strong><\/th>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>What needs to happen<\/strong><\/th>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Timing considerations<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Move-in preparation<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Complete handover, arrange utilities, schedule movers<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Leave time to settle before school<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Final inspections<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Finish outstanding work and obtain required approvals<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Occupancy may depend on completed inspections<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Interior and exterior finishes<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Complete flooring, cabinets, fixtures, paint, and exterior details<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Material scheduling and corrections may affect timing<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Main construction<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Complete foundation, framing, roofing, and mechanical systems<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Weather and site conditions can affect progress<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Permit review<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Submit complete plans and obtain approvals<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Allow time for the applicable review process<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Floor plan and design<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Select the layout and finalize necessary changes<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Design revisions may affect permit readiness<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Lot evaluation<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Confirm site conditions, access, utilities, and buildability<\/td>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Additional site work may be required<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Not every stage has a fixed duration. Some activities can overlap, while others must happen in a specific order.<\/p>\n<h3>Mark These Three Dates for Your Family&#8217;s Move<\/h3>\n<p>Instead of relying on one moving date, identify three milestones:<\/p>\n<ul>\n<li><strong>Ideal move-in date<\/strong>: When you&#8217;d prefer to receive the keys and begin settling in.<\/li>\n<li><strong>Latest acceptable move-in date<\/strong>: The point when moving would become too disruptive to your family&#8217;s school plans.<\/li>\n<li><strong>School start date<\/strong>: The deadline guiding enrollment, childcare, and transportation arrangements.<\/li>\n<\/ul>\n<p>For example, your family might prefer to move in mid-August but be willing to move during the last week of the month. Another family might have a lease that ends soon, leaving little room for delays. Share these priorities with your builder so everyone understands which dates have flexibility and which don&#8217;t.<\/p>\n<h3>Allow Time for Construction Delays<\/h3>\n<p>Even a carefully managed home build can experience schedule changes.<\/p>\n<p>A permit application might need additional documentation. Weather can delay site work. A design adjustment could require further coordination. An inspection might identify something that needs attention before construction proceeds.<\/p>\n<p>Your builder&#8217;s estimated schedule should identify major milestones, but your moving arrangements should account for potential changes. Avoid ending a lease, scheduling the closing on your existing home, or booking nonrefundable moving services based solely on an early projected completion date.<\/p>\n<h2>Choose Your Floor Plan and Finalize Design Decisions Early<\/h2>\n<p>Building a semi-custom home lets you start with an established floor plan while making select customizations to suit your family.<\/p>\n<p><a href=\"https:\/\/www.newerahomes.com\/family-floor-plans\/\">Floor plan design priorities for families with children<\/a> might include:<\/p>\n<ul>\n<li>A dedicated home office or homework area.<\/li>\n<li>A mudroom with storage for backpacks and sports equipment.<\/li>\n<li>A larger pantry for groceries and school lunches.<\/li>\n<li>Bedroom locations that provide privacy.<\/li>\n<li>A flexible room that can serve different purposes as children grow.<\/li>\n<li>Outdoor living space for family activities.<\/li>\n<\/ul>\n<p>Making these decisions early limits last-minute design changes once construction planning is underway.<\/p>\n<h3>How Heritage Edition and Premier Edition Homes Affect Planning<\/h3>\n<p>New Era Homes offers two approaches to semi-custom homebuilding:<\/p>\n<ul>\n<li><strong>Heritage Edition<\/strong> uses established floor plans, with modifications and selections available within the scope of the Heritage Price Book. Families can review the options and choose the features that meet their needs.<\/li>\n<li><strong>Premier Edition<\/strong> provides broader flexibility for floor plan customization, trim, finishes, and electrical and plumbing options.<\/li>\n<\/ul>\n<p>More extensive changes may require additional planning and coordination. However, the edition you choose doesn&#8217;t establish a fixed construction timeline.<\/p>\n<p>If moving before the school year is a priority, discuss your preferred modifications with New Era Homes early. You&#8217;ll want to understand which changes are available and how they could influence the construction schedule.<\/p>\n<h3>Evaluate Your Lot Before Committing to a Move-In Date<\/h3>\n<p>Owning land doesn&#8217;t necessarily mean construction can begin immediately. Your property may need additional evaluation for grading, access, utilities, septic systems, setbacks, or other site requirements. These conditions influence the work required before construction and may affect the overall schedule.<\/p>\n<p>New Era Homes offers property evaluations to help prospective buyers identify buildability considerations before purchasing land.<\/p>\n<p>If you already own a lot, share its details with your builder early. If you&#8217;re still searching for property, ask how different site conditions could influence your intended move-in date.<\/p>\n<h2>Account for Deschutes County Permit Review<\/h2>\n<p>Permitting needs a dedicated slot on your homebuilding calendar.<\/p>\n<p>A summer move-in might seem doable when you look only at construction time, but those permits must be in place before work they cover can move forward.<\/p>\n<h3>How Long Does Residential Building Permit Review Take?<\/h3>\n<p>According to<a href=\"https:\/\/www.deschutescounty.gov\/598\/Processing-Times-for-Permits\"> <\/a><a href=\"https:\/\/www.deschutescounty.gov\/598\/Processing-Times-for-Permits\">Deschutes County&#8217;s published permit processing times<\/a>, the listed timelines for residential building permits include:<\/p>\n<div style=\"overflow-x:auto;margin:26px 0;\">\n<table style=\"width:100%;min-width:640px;border-collapse:collapse;border-top:1px solid #e7dfd4;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Review stage<\/strong><\/th>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Published queue time<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Application intake<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">1 week<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Residential building review<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">8\u20139 weeks<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Planning review, when required without additional planning permits<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">10 days<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The county specifies that building and planning reviews occur simultaneously when both apply. You shouldn&#8217;t automatically add the two review periods together.<\/p>\n<p>The eight-to-nine-week building review period applies once an application is complete. Submitting paperwork doesn&#8217;t necessarily mean review can begin immediately.<\/p>\n<p>Missing information or requested corrections may extend the process. Processing times can also change with application volume and project complexity.<\/p>\n<h3>Does Every Home in Bend Follow the Same Permit Timeline?<\/h3>\n<p>No. The permitting process varies by property location.<\/p>\n<p>A home within Bend city limits may follow different procedures and review timelines than one in unincorporated Deschutes County. Additional approvals for septic systems, driveway access, or other site requirements may also apply.<\/p>\n<p>Before building your schedule around a published estimate, confirm which agency will review your project and what approvals your property requires.<\/p>\n<h3>How Permit Delays Can Affect a School-Year Move<\/h3>\n<p>Consider a family that has selected a floor plan but still needs additional site documentation for its permit application. If gathering those documents takes longer than expected, the application may be ready for review later than planned. Construction could then begin later, leaving less time before the school year starts.<\/p>\n<p>Ask your builder two questions:<\/p>\n<ul>\n<li>When can we realistically submit a complete permit application?<\/li>\n<li>What must happen before construction can begin?<\/li>\n<\/ul>\n<p>Those answers will tell you far more about your schedule than a general construction-time estimate.<\/p>\n<h2>Plan for Winter Construction in Central Oregon<\/h2>\n<p>Bend&#8217;s winter weather adds another consideration to the homebuilding schedule. Cold temperatures, snow, and changing site conditions can affect construction, particularly excavation, concrete work, and framing.<\/p>\n<p>Homes can be built in winter, but the schedule must account for the work being performed and your property&#8217;s conditions.<\/p>\n<h3>Concrete and Foundation Work<\/h3>\n<p>Placing concrete during cold weather may require additional protection, temperature management, and curing precautions. Frozen ground or difficult site access can also interfere with excavation and preparation work.<\/p>\n<h3>Framing and Exterior Construction<\/h3>\n<p>Snow, ice, high winds, and limited site access can affect framing and other exterior activities. A project that reaches framing during favorable weather may progress differently from one facing repeated storms or unsafe conditions.<\/p>\n<p>Once the structure is enclosed, some interior work is less exposed to the weather, although those phases have their own scheduling requirements.<\/p>\n<h3>What Winter Delays Could Mean for an August Move<\/h3>\n<p>Imagine your construction schedule places foundation and framing work during winter, followed by interior finishes in spring and early summer. If weather-sensitive activities take longer than expected, you&#8217;ll have less time for the remaining work before August.<\/p>\n<p>Ask your builder which major construction phases are expected to occur during winter and how seasonal conditions are reflected in the schedule.<\/p>\n<p>There&#8217;s no reliable number of winter delay weeks that applies to every project. Conditions vary by property, construction stage, and weather.<\/p>\n<h2>When Is It Too Late to Aim for Next September?<\/h2>\n<p>If you&#8217;re planning a semi-custom home in Bend, there&#8217;s no universal cutoff month that determines whether you&#8217;ll be ready by September.<\/p>\n<p>If the time remaining before your preferred move-in date is shorter than your builder&#8217;s documented schedule for the unfinished work, including reasonable contingency time, then it\u2019s time to reconsider your September goal. Continuing to plan around September after that point can create financial pressure and make school arrangements harder to manage.<\/p>\n<h3>Know When to Plan for the Following School Year<\/h3>\n<p>Use these questions to evaluate whether your preferred move-in date remains achievable.<\/p>\n<div style=\"overflow-x:auto;margin:26px 0;\">\n<table style=\"width:100%;min-width:640px;border-collapse:collapse;border-top:1px solid #e7dfd4;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>Question<\/strong><\/th>\n<th scope=\"col\" style=\"padding:12px 18px 12px 0;text-align:left;vertical-align:bottom;font-size:0.8em;letter-spacing:0.07em;text-transform:uppercase;color:#6c4b2b;border-bottom:1px solid #e7dfd4;\"><strong>What to confirm<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Is the lot ready for construction?<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Whether additional site preparation could delay the project<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Are the floor plan and required selections finalized?<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Whether further design changes could affect scheduling<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Are the necessary permits approved?<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Whether the project has the required authorizations<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Does the remaining schedule support your move-in date?<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Whether construction, inspections, and occupancy can be completed in time<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4; font-weight:700;\">Is there room for unexpected delays?<\/th>\n<td style=\"padding:14px 18px 14px 0;text-align:left;vertical-align:top;line-height:1.5;border-bottom:1px solid #e7dfd4;\">Whether your family has flexibility if the schedule changes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>If the answers don&#8217;t support your deadline, consider planning for the next summer instead.<\/p>\n<p>Changing your moving date doesn&#8217;t mean abandoning your homebuilding plans. It allows you to make thoughtful decisions about the house without rushing to meet an uncertain deadline.<\/p>\n<h2>What If Your New Home Isn&#8217;t Ready Before School Starts?<\/h2>\n<p>Sometimes your construction schedule and the school calendar won&#8217;t align. You can prepare for that possibility before it becomes an urgent housing problem.<\/p>\n<h3>Consider Temporary Housing or a Delayed Move<\/h3>\n<p>If you currently live in Bend, you may be able to stay in your home until construction is complete. Families relocating from outside Central Oregon might need a short-term rental or another temporary housing arrangement.<\/p>\n<p>Before committing, consider rent, storage, moving expenses, utilities, and any overlapping mortgage or housing payments. If you have a lease, ask about extension options before it expires.<\/p>\n<h3>Keep School Enrollment Separate From Construction<\/h3>\n<p>Don&#8217;t base enrollment decisions entirely on an anticipated home completion date.<\/p>\n<p>Contact Bend-La Pine Schools to confirm registration procedures, address documentation, attendance boundaries, and transportation options. A property under construction may not satisfy every enrollment requirement. Purchasing land also doesn&#8217;t guarantee enrollment at a particular school.<\/p>\n<p>If you expect to move during the school year, ask what steps will be required when your family changes addresses.<\/p>\n<h3>Prepare for a Midyear Move if Necessary<\/h3>\n<p>Moving during the academic year isn&#8217;t always ideal, but it may be preferable to rushing construction. Parents can contact school staff before the transition, arrange record transfers, and help children prepare for new routines. <\/p>\n<p>For some families, finishing the school year at their current school and moving in the summer can reduce disruptions. Others may be comfortable with a midyear transition. Your children&#8217;s ages, school arrangements, housing situation, and available flexibility should guide that decision.<\/p>\n<h2>Questions to Ask Your Builder Before Choosing a Move-In Date<\/h2>\n<p>A builder consultation can help you determine whether your preferred school-year moving plan is realistic.<\/p>\n<p>Consider asking:<\/p>\n<ul>\n<li><strong>How soon can my lot be evaluated?<\/strong> Find out whether additional site work or approvals may be required.<\/li>\n<li><strong>Which floor plan decisions need to be made first?<\/strong> Confirm what must be completed before permitting.<\/li>\n<li><strong>What permitting process applies to my property?<\/strong> Identify the relevant authority and expected review requirements.<\/li>\n<li><strong>Which construction phases will occur during winter?<\/strong> Discuss how seasonal conditions are reflected in the schedule.<\/li>\n<li><strong>What&#8217;s the current estimated construction timeline? <\/strong>Request an estimate based on your actual project rather than a general average.<\/li>\n<li><strong>How will schedule changes be communicated?<\/strong> Ask when you&#8217;ll receive updated milestones.<\/li>\n<li><strong>What must happen before we can move in?<\/strong> Clarify inspections, occupancy approvals, and the handover process.<\/li>\n<li><strong>When should we make firm moving arrangements? <\/strong>Find out which construction milestones provide a more reliable basis for scheduling movers or ending your existing housing arrangements.<\/li>\n<\/ul>\n<p>These conversations can reveal scheduling concerns before your family makes expensive commitments.<\/p>\n<h2>Frequently Asked Questions About Building a Home Around the School Year<\/h2>\n<h3>How early should you start planning a home build before school starts?<\/h3>\n<p>Begin as early as you can, before you&#8217;re facing a firm moving deadline. You&#8217;ll need time to evaluate the lot, select a floor plan, make design decisions, secure permits, complete construction, and obtain the approvals required for occupancy.<\/p>\n<p>There is no universal lead time. Ask your builder for an estimated schedule based on the property and home you intend to build.<\/p>\n<h3>Is it faster to build a semi-custom home than a fully custom home?<\/h3>\n<p>Building from an established floor plan can reduce some of the design work involved in creating a fully custom home. Actual construction timelines still vary based on lot conditions, requested modifications, permit requirements, and the builder&#8217;s schedule.<\/p>\n<p>New Era Homes offers different customization options through Heritage Edition and Premier Edition home tiers. Discuss your preferred changes with your builder to understand how they could affect planning and construction.<\/p>\n<h3>How long does it take to get a building permit in Deschutes County?<\/h3>\n<p>Deschutes County lists a residential building review queue of eight to nine weeks once an application is complete. Application intake is listed separately, and additional reviews or site permits may apply. <\/p>\n<p>Properties within Bend city limits may follow different procedures and timelines. Check the<a href=\"https:\/\/www.deschutescounty.gov\/598\/Processing-Times-for-Permits\"> <\/a><a href=\"https:\/\/www.deschutescounty.gov\/598\/Processing-Times-for-Permits\">current Deschutes County permit processing information<\/a> and confirm your property&#8217;s requirements before choosing a construction start date.<\/p>\n<h3>Can a home be built during winter in Bend?<\/h3>\n<p>Yes. Residential construction can continue during winter when conditions and construction methods allow. However, freezing temperatures, snow, and site access can affect excavation, concrete work, framing, and exterior construction. Your builder should account for these conditions when preparing the project schedule.<\/p>\n<h3>What happens if construction isn&#8217;t finished before school starts?<\/h3>\n<p>Your family may need to extend its current housing arrangement, find temporary accommodations, or move during the school year. Before making arrangements, confirm enrollment and transportation requirements with the school district. Keep your builder informed of housing deadlines that could influence your decisions.<\/p>\n<h3>Should we wait until the following summer to move?<\/h3>\n<p>Waiting may reduce life disruption if the remaining construction schedule doesn&#8217;t allow you to move before school begins. However, some families may be comfortable moving during the school year or staying in temporary housing until their home is complete. Consider construction progress, housing expenses, school arrangements, and your family&#8217;s priorities before deciding.<\/p>\n<h2>Plan Your Bend Home Build With New Era Homes<\/h2>\n<p>A school-year deadline gives your family a useful planning goal, but we don\u2019t recommend letting it force rushed decisions about your home.<\/p>\n<p>New Era Homes can help you evaluate your property, explore semi-custom floor plans, review personalization options, and understand the construction process.<\/p>\n<p>If you&#8217;re considering building in Bend or elsewhere in Central Oregon,<a href=\"https:\/\/www.newerahomes.com\/\"> <\/a><a href=\"https:\/\/www.newerahomes.com\/\">contact New Era Homes<\/a> to discuss your preferred move-in date, lot status, and homebuilding priorities. We\u2019ll help you better understand the steps ahead and what your family needs to prepare for a successful move.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building a home while raising school-age children takes careful scheduling. If you want to move into a new home in Bend before classes begin, you&#8217;ll need to plan time for design decisions, permits, construction, inspections, and the move itself. Can you build a semi-custom home before the school year starts? Yes, if you begin early [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":971,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19],"tags":[],"class_list":["post-966","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-process"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes<\/title>\n<meta name=\"description\" content=\"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes\" \/>\n<meta property=\"og:description\" content=\"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/\" \/>\n<meta property=\"og:site_name\" content=\"Home Building Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-13T09:00:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-13T17:12:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"772\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/#\\\/schema\\\/person\\\/7e624e62ad262f95f0c83cafda879493\"},\"headline\":\"Can You Move Into a New Build Before the School Year Starts?\",\"datePublished\":\"2026-11-13T09:00:20+00:00\",\"dateModified\":\"2026-11-13T17:12:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/\"},\"wordCount\":2793,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/new-era-homes-gallery-227.webp\",\"articleSection\":[\"Building Process\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/\",\"url\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/\",\"name\":\"How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/new-era-homes-gallery-227.webp\",\"datePublished\":\"2026-11-13T09:00:20+00:00\",\"dateModified\":\"2026-11-13T17:12:31+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/#\\\/schema\\\/person\\\/7e624e62ad262f95f0c83cafda879493\"},\"description\":\"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/new-era-homes-gallery-227.webp\",\"contentUrl\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/new-era-homes-gallery-227.webp\",\"width\":1200,\"height\":772,\"caption\":\"New Era Homes home in Central Oregon\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/building-a-home-around-the-school-year\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Can You Move Into a New Build Before the School Year Starts?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/\",\"name\":\"Home Building Blog\",\"description\":\"New Era Homes\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/#\\\/schema\\\/person\\\/7e624e62ad262f95f0c83cafda879493\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\\\/\\\/www.newerahomes.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes","description":"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/","og_locale":"en_US","og_type":"article","og_title":"How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes","og_description":"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.","og_url":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/","og_site_name":"Home Building Blog","article_published_time":"2026-11-13T09:00:20+00:00","article_modified_time":"2026-11-13T17:12:31+00:00","og_image":[{"width":1200,"height":772,"url":"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp","type":"image\/webp"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#article","isPartOf":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/"},"author":{"name":"admin","@id":"https:\/\/www.newerahomes.com\/blog\/#\/schema\/person\/7e624e62ad262f95f0c83cafda879493"},"headline":"Can You Move Into a New Build Before the School Year Starts?","datePublished":"2026-11-13T09:00:20+00:00","dateModified":"2026-11-13T17:12:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/"},"wordCount":2793,"commentCount":0,"image":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#primaryimage"},"thumbnailUrl":"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp","articleSection":["Building Process"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/","url":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/","name":"How to Plan a Home Build Around the School Year in Bend, OR | New Era Homes","isPartOf":{"@id":"https:\/\/www.newerahomes.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#primaryimage"},"image":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#primaryimage"},"thumbnailUrl":"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp","datePublished":"2026-11-13T09:00:20+00:00","dateModified":"2026-11-13T17:12:31+00:00","author":{"@id":"https:\/\/www.newerahomes.com\/blog\/#\/schema\/person\/7e624e62ad262f95f0c83cafda879493"},"description":"Want to build a home in Bend? Learn how to plan around school dates, permit reviews, winter construction, and realistic move-in timelines.","breadcrumb":{"@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#primaryimage","url":"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp","contentUrl":"https:\/\/www.newerahomes.com\/blog\/wp-content\/uploads\/2026\/11\/new-era-homes-gallery-227.webp","width":1200,"height":772,"caption":"New Era Homes home in Central Oregon"},{"@type":"BreadcrumbList","@id":"https:\/\/www.newerahomes.com\/blog\/building-a-home-around-the-school-year\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.newerahomes.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Can You Move Into a New Build Before the School Year Starts?"}]},{"@type":"WebSite","@id":"https:\/\/www.newerahomes.com\/blog\/#website","url":"https:\/\/www.newerahomes.com\/blog\/","name":"Home Building Blog","description":"New Era Homes","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.newerahomes.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.newerahomes.com\/blog\/#\/schema\/person\/7e624e62ad262f95f0c83cafda879493","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b767a6ae0dd2284554be04b69140c5c79294115a4d2ce0ba4106503c8cf6812d?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/www.newerahomes.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/posts\/966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/comments?post=966"}],"version-history":[{"count":2,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/posts\/966\/revisions"}],"predecessor-version":[{"id":978,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/posts\/966\/revisions\/978"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/media\/971"}],"wp:attachment":[{"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/media?parent=966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/categories?post=966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newerahomes.com\/blog\/wp-json\/wp\/v2\/tags?post=966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}